Channel drainage is used to prevent the build-up of surface water in unwanted areas. Whether that be in paved, tarmacked, or concrete areas, you still need to evaluate how you can remove and prevent the build-up of surface water and install the channel drainage.
Due to the increased risk of flooding, it has now become a legal requirement that to install channel drainage on any driveway which is over 5m2.
If installed correctly, channel drainage offers a simple, efficient, and aesthetic solution to your surface water needs. To help you towards reaching this goal, we have created a ‘how to guide’ to ease you into the installation process.
Without realising you will see channel drainage numerous times throughout your day-to-day life, you may have it in your garden, your driveway or walked over it whilst out and about. This is due to channel drainage being discreet, unobtrusive method of drainage, that can be used in a variety of different areas and applications such as patio areas in your garden to landing strips at the airport, to prevent the build-up of unwanted surface water.
Despite being a smaller more discreet method of drainage, your channel drainage can remove and prevent large quantities of water. Channel drainage can be laid in lengths, much longer than they are in width. This is due to the cross -sectional design which helps to contain the water flow from different surfaces.
Drainage channel -
Gratings –
End caps –
End Cap Outlets –
Corner Units –
Sump units –
Our channel is sold completely separately to the accessories, bar the gratings as they come as a complete unit. You can find all the correct accessories on our website.
At PolyChannel we have focused our expertise around two of the main materials, those being polymer concrete and composite. We also have a multitude of gratings ranging from composite, ductile iron, and stainless steel. Offering a variety of different materials and gratings means we can adjust to the weight classes in the industry. Our channels range from A15 (1.5 Tonnes) right up to F900 (90 Tonnes), meaning we have products which can be installed on your driveway or in an industrial yard.
Load Class Weight Load Uses & Applications
A15 1.5 tonne Pedestrians, Cycles, Driveways, Patios, Gardens.
B125 12.5 tonne Slow-moving light-duty vehicles, vans, and cars.
C250 25 tonne Light Traffic – Private car parks for vans & cars.
D400 40 tonne Highways, public car parks & light commercial vehicles.
E600 60 tonne Industry areas, loading bays, heavy-duty vehicles.
F900 90 tonne Heavy-duty vehicles, docks, airports, industrial areas.
Domestic areas:
We focus our domestic channels towards patio’s, gardens, driveways, doorways, and other landscaped areas. A domestic channel is usually load classes A15 (1.5 tonnes) or B125 (12.5 Tonnes).
Commercial Areas:
Our commercial drainage steps up a load class, these channels usually range from C250 (25 Tonnes) to E600 (60 Tonnes). Commercial channels are best suited for applications like car parks, retail parks, shopping centres and so on.
Industrial Areas:
Industrial areas need to be able to withstand the constant moving of heavy vehicles, therefore, they need to be F900 (90 tonnes). You would most likely find a F900 channel in industrial areas, delivery yards, docks, and airports.
Once you have drained the water from the above ground surfaces you need to dispose of it back into the sewer systems. To do so you can use two possible options, this being an end cap outlet, or a vertical outlet. Both methods allow you to attach the channel to drainage pipes.
A vertical outlet is in the bottom of the channel and can be easily cut out, this allows you to attach the channel to your drainage pipe by simply pushing it into place. Vertical outlets are normally 110mm diameter and can be found on our sister site www.polydrainage.co.uk
On the other hand, you may also use the end cap outlet this allows you to adapt the end of your run to fit a pipe connecting to the underground drainage system.
Step 1:
The first step in installing your channel drainage is digging the trench. You need to ensure that you dig deep enough for at least a 50mm sand base.
Step 2:
From here you need to attach a string line which is the length of your run, this line should finish at the height of your gratings. It is suggested that this line should sit around 2mm lower than the surface level once finished.
Step3:
Once you are starting the actual installation process you should begin at the lowest point. E.g., when your section meets the drain.
Step 4:
When you have laid the first section of your channel you can slot the other sections in place. When placing the channels down you should do so with the gratings installed, to ensure they follow up in their height.
Step 5:
When you’re getting to the last stages of laying your channel you should now cap of the final section, using the end cap.
Step 6:
When the channel is in the ground you should seal and grooves with a silicone sealant, this ensure that the channel is watertight.
Step 7:
When your channel is lay you can start to pour the concrete. You should pour the concrete at a 2mm height difference above the grate section of the channel.
When following our guide, you should be able to install the channel perfectly, however, you can still botch up a job if you select the wrong channel.
It is vital that you install the channels that can withstand the heaviest loading that may pass over it. You should also look out for key components of the channel, one of these being the EN14 33 standards.